Mosaic K3
2021

Noble Construction Corp. is currently working on a 300-ton surge bin at the Mosaic K3 underground mine. Noble is also installing two conveyor belts that will continuously feed and empty the bin. The construction consists of steel bolt up, mechanical component install, welding, electrical install and critical lifts up to 38,000 lbs with a two pick hoist. This is the second surge bin that Noble has constructed along with various other ongoing projects. The project is moving along on time, on budget and most importantly SAFELY.