Tuesday October 24, 2017

On October 13, 2017 at 2:18PM, permanent utility power was turned on into the Mosaic K3 Mine.

Noble Construction is very proud to have been a part of this significant milestone in the Mosaic K3 Mine development.

In addition to those pictured, a number of additional Noble employees were involved in the contract to install and commission the electrical equipment pictured in this photo. Pictued above (L-R): Glen Joubert, Barrie Sorrell, Rick Douglas (Hatch), Greg Doll, Brian Lee (Hatch) and Geoff Matisho (Mosaic).

Posted under: Industry News